Ankeny Pump Station Upgrade


This project replaced the entire electrical system of an existing pump station serving two 250HP pumps and four 200HP pumps. The scope of work included the design and installation of a 15kV temporary service and PLC control serving a temporary pumping system, a new duel fed 15kV service, 15kV ATS, two 1500KVA transformers, 2,000A 480V switch board, 600A MCC, PLC and installation of all instrumentation and control.
Client: City of Portland
Location: Portland, OR